What
is Accelerated Construction?
Accelerated construction is an
advanced form of facility construction in which
a building is built in three-dimensional sections
(or modules) in an enclosed factory environment.
Accelerated construction utilizes a modular
construction approach to shorten timelines and
provide a value-engineered solution.
Every Comark modular building starts with a precisely
designed floor plan. This plan is divided into
smaller sections or modules which are constructed
separately in our state-of-the-art factories
using conventional commercial wall, floor,
roof and ceiling materials. All major systems
including mechanical, electrical, plumbing
and finishes are completed prior to shipping
and installation on your site. From start to
finish, it only takes us a few days to construct
many modules saving you months of time.
During the time that your modules are being
constructed, site development teams are
preparing your site and performing any needed on-site
construction (a process called concurrent construction).
This ensures that time savings are maximized
throughout the building process.

|