Comark CareersNew and Events
About Comark
About Accelerated Construction
Comark Building Types
Comark Building Solutions
Comark Services
Case Studies
Accelerated Construction Video
Photo Gallery
Strategic Partners
Purchasing Information
     
 

To learn more about reducing construction timelines while maintaining quality construction, watch this 3-minute video detailing the advantages of Comark's Accelerated Construction Process.

Watch Now >>

view modular buildings

Call us today at:

800-760-3784

 

Design Build Process ensuring value saving, time savings and quality assurance. Click to contact a Comark project manager today!
Design & Engineering l Warranty & Maintenance l Financing & Leasing

Warranty & Maintenance Services All Comark buildings are warranted for one year for defective materials and/or workmanship.

Building component Operation and Maintenance Manuals will be provided to the customer to make available the technical aspects of each building system and component. The manuals should prove invaluable in diagnosing problems for a resolution or for reporting to the contractor.


To maintain the quality of your building and extend its lifecycle, Comark recommends doing several monthly preventative maintenance checks.

  1. Inspect roof for potential roof leaks and repair.
  2. Inspect all visible plumbing pipes for potential leaks and repair.
  3. Report observable warranty service problems not already reported.
  4. Inspect structures for vandalism or abuse and report same.
  5. Check and replace dirty HVAC filters.
  6. Observe operation of all building systems, plumbing, electrical, HVAC and fire alarm.
  7. Perform or witness required monthly tests (i.e. fire alarm & fire sprinkler).
  8. Check all toilet partitions for loose screws etc. and correct as needed.
  9. Check all restroom accessories for tight attachments to walls or partitions and correct as needed.
  10. Check all counters and cabinets for movement and tighten or caulk as required.
  11. Check for damage to walls, ceiling, floors and doors and report vandalism or repair as necessary.
  12. Check the operation of the heat tape protecting the water lines under the building (Oct. - Apr.).
  13. Check for debris that can cause blockage in all gutters and downspouts.
  14. Check and clear, if necessary all HVAC condensate lines.
  15. Add agents in HVAC condensate pans as required to keep the clean of algae.

 
 

About Comark Modular Building .. l .. About Modular Building Construction.. l .. Comark Modular Buildings.. l .. Design-Build.. l ..Large Scale/Accelerated
Healthcare Modular Facilities.. l .. Portable Commercial Buildings & Modular Retail Buildings.. l .. Modular Government Buildings
Prefab Education & Childcare Buildings.. l .. Case Studies.. l .. Sitemap