Case Study: Fort Lewis Stryker Barracks
Building ‘Green’ for the Military
|
Building Project Information Tacoma, WANumber of Modules: 87Average Size of Modules:14’ X 63’ X 14’Total SF: 72,870Use: BarracksDays to Completion: 353 Days |
Architectural Excellence
A three story 72,870 square foot barracks was designed for Fort
Lewis Stryker to
provide comfortable living quarters for enlisted personnel. The barracks
building
contains 100 two person apartments with individual carpeted bedrooms,
along with a
tiled bathroom, common area and kitchen. Exterior cladding is pre-finished
multicolor
rolled metal siding. The exterior design was the result of an architectural
interpretation of the desired appearance of the building in order
to blend with the
existing environment.
Technical Innovation
The all steel frame modular structure progressive collapse system is the first of its kind and now serves as the prototype for subsequent projects. Built in the factory to accommodate the 5:12 roof pitch, the folding steel section roof systems collapses for transport and is then raised and secured on site. The building’s progressive collapse design meets federal guidelines that the building does not collapse when any two interior columns are removed. Anti-Terrorism Force Protection (ATFP) requirements are incorporated into the site and building components including: vehicle parking and approach setbacks, force protection exterior glass, and 2nd story air intakes for mechanical systems
Cost Effectiveness/Energy Efficiency
A folding steel section collapse for the roof section created a great savings and made it possible to easily transport the sections, crane lifting them once modules were set at the site. The six week manufacturing time-frame provided increased savings over sitebuilt construction and minimized waste. A high tech DDC energy management system controlled heating from a remote location for unoccupied rooms. Occupancy sensors controlled critical lighting. Conduit pathways for CAT6 wiring network of high speed communication, mass notification, and centralized fire alarm systems were configured at the time of manufacture. 90% of the full sprinkler system was installed in the modules in the factory. HRU energy recovery units and hydronic heating maximized heating system efficiencies.